Reviews & Case Studies

Our systems have been installed in a wide range of applications. Please select a case study below to learn more about recent installations and the savings achieved. To learn more about our experience in working in specific sectors please do not hesitate to contact our technical sales team. Read customer quotes here. 

"We have converted two Hamworthy dual fuel burners over to the Autoflame digital control and run them for nearly 12 months with excellent results. We will be fitting the last boiler with the same controls this year. The engineers did a very neat job of the installation and required little in the way of management from me."

Stephen Moore
Facilities Manager, Kent Science Park

“The solution is well manufactured to a high quality and the Autoflame controls have many features we have found beneficial. We were impressed with the minimal downtime that the project needed, 15-20 minutes, and the installation went very smoothly.”

Andrew Burge
London Regional Plant Engineer, Morgans Hotel Gorup

“Now the installation is completed, I would like to express my appreciation to your team who were under extreme pressure to complete the installation within the tight shut down programme. On one of the days your team worked beyond the twelve hour shift. At the end of each day they cleaned up any debris to keep the area tidy. The team were a credit to your company.”

Barry Wisbey
AkzoNobel, Slough

"We are delighted with the energy savings that the project has delivered, the upgrade was very straightforward and the combustion efficiency report helped us understand the inefficiencies of our old system and how savings could be achieved."

Paul Garrett
Network and Resource Manager, Charles Darwin School

The improved boiler integration with the CHP has delivered clear savings for the University by delivering longer running times and improved load factors for the CHP. This has been especially apparent at times of low load. Despite the much reduced demand for heat, on much warmer weather this January, CHP output has increased by 16%, worth thousands of pounds to us. Integration with our BMS has enabled us to monitor the new burners acting responsively to very low loads.

Dr John Brenton
Sustainability Manager, University of Bristol

"The improved boiler integration with the CHP has delivered clear savings for the University by delivering longer running times and improved load factors for the CHP. This has been especially apparent at times of low load. Despite the much reduced demand for heat, on much warmer weather this January, CHP output has increased by 16%, worth thousands of pounds to us. Integration with our BMS has enabled us to monitor the new burners acting responsively to very low loads."

Dr John Brenton
Sustainability Manager, University of Bristol

“We are very pleased with the Limpsfield and Autoflame equipment, and CSI Services Installation Technicians performed the work on schedule and on budget. They are always a phone call away, and very prompt with any service or guidance we need or request. I would recommend CSI Services and the products they sell very highly to the commercial, industrial, and institutional platform.”

Harry Eimerbrink
Facilities Director, Central York School District

"An excellent service and installation provided by Autoflame."

David Waterman
Engineer, Northwick Hospital